Assessing a watercourse on a site visit

Assessing a watercousre on a site visit

Site visit & report

During the initial site visit, we would discuss your aspirations from the scheme. On a tour of the site we would share with you our initial impressions of the site’s potential, the type of hydropower turbine which the site would suit and the environmental considerations which must be taken into consideration. We would also review your grid connection options and any other factors which may be specific to your site.

Following our site visit, we would run the scheme geography through our catchment area modelling programme, which would give us an estimate of potential power generation and revenue. We would then develop a report for you including the following information;